ABRIDGEMENT ON PROJECTS EXECUTED
|
ANDHRA
PRADESH PAPER MILLS, SECUNDERABAD
|
1. |
Project
: Blow Heat Recovery
System
1. Design and
Detailing of
Pressure vessels,
Spray Condensers,
Cyclones, Water
filters, Storage
Tanks, etc.
2. Preparation
of G.A, equipment
layout, piping
( floor wise
and isometric
view), process
and instrumentation
drawings.
|
Codes
used : ASME Section
VIII, Division
1, BIS and Good
Engineering
|
Consultant
: Thakur Associates,
Pondicherry
|
Description
: Preparation
of Process flow
diagram, design
and detailing
of all equipments,
as mentioned
above as per
the respective
design codes,
preparation of
bill of quantities
for pipes, plates,
valves, etc.
Preparation of
specification,
floating enquires
on respective
vendors and negotiation
for pipes, plates,
valves, plate
heat exchanges,
complete instrumentation
and electrical
including control
panels, etc.
Erection and
commissioning
supervision for
entire project.
|
|
2. |
Project
: Material conveying
system (on turn
key basis)
|
Scope
of work :
Our scope of
work involves
design, detailing,
preparation of
pipe line layout,
supply of equipment,
work supervision,
erection of equipment,
pipe line (PVC)
laying, commissioning
and handing over
the system as
a whole in running
condition.
|
Codes
used : ASME Section
VIII, Division
1, BIS and Good
Engineering
|
Description
: Preparation
of Process flow
diagram, design
and detailing
of all equipments,
as mentioned
above as per
the respective
design codes,
preparation of
bill of quantities
for pipes, plates,
valves, etc.
|
INSTRUMENTATION
PHYLOSOPHY:
This
system is suitable
to run either
manually or automatically.
Always the agitator
in the sump will
be running to
avoid the settlement
of solids and
uniform mixing.
Once the sump
is filled up
a pre determined
level by sensing
of this will
be done through
a level indicator
and then the
single will be
passed to the
pump to start
to pump the mixture
to the collection
tanks through
a buffer tank.
Similarly by
sensing the low
level through
the level indicator
the pump trip
off. Each sump
will provide
2 sets of level
sensing elements
to sense effectively.
Once the process
pump stops after
few seconds the
hot water pump
starts pumping
the hot water
for a specified
period for every
operation at
pressure of 5
kg/sq.cm to flush
out the delivery
line.
|
|
ADVANTAGES
OF REVISED SYSTEM
OVER THE EARLIER
ONE:
|
|
- This
system
can
be
run
either
automatically
or
manually.
- As
there
are
no
other
valves
on
the
delivery
line,
expect
the
non
return
valve,there
will
not
be
any
problem
with
choking
/ clogging
- As there
are
no
pneumatic
/ electric
automatic
valves
this
system
is
a maintenance
free
system
- There
are
no
PLCs
in
the
system
the
cost
of
the
project
can
be
reduced
by
20%
of
the
last
offer
value.
- 100%
flushing
will
be
done
in
this
system
and
50%
more
water
supplying
- Minimum
and
maximum
percentage
of
solids
can
be
maintained
easily,
as
the
hot
water
quantity
is
fixed
which
we
know
also.
- With
the
addition
of
the
agitators
one
can
ensure
that
the
mixing
of
solids
and
liquid
will
be
uniform
by
which
we
can
reduce
the
choking
/ clogging
in
the
pump.
|
|